OMWD Pump Station, Fore-bay Tank, and Water Main Extension No. 144

The Olivenhain Municipal Water District project combined a pump station, a fore-bay tank, and a transmission water main extension, delivered under a design-build arrangement for a public water agency in north San Diego County.

Olivenhain, San Diego County, CaliforniaWater InfrastructureCalifornia A License #777345

The construction challenge

Water infrastructure projects concentrate risk in places that are invisible on a site plan. A pump station is a small building containing complicated mechanical, electrical, and control systems, and the schedule is usually driven by equipment procurement and commissioning rather than by civil construction. Long lead pumps, motor control equipment, and instrumentation have to be procured early, factory tested, delivered, installed, integrated with the district's SCADA system, and commissioned before the facility can be accepted.

The transmission main adds its own difficulties. Pipeline alignment conflicts with existing utilities are routine, trench safety and dewatering in constrained alignments require planning, and bedding, backfill, and compaction testing must satisfy the district's standard specifications. Pressure testing, disinfection, and bacteriological clearance are prerequisites to service, and failing any of them means repeating steps that consume weeks.

Tie-ins to an operating system require shutdown windows coordinated with district operations, and those windows are short, scheduled well in advance, and unforgiving. A tie-in that does not complete within its window is not simply late. It is a service interruption.

Design-build delivery on a district project requires that the district's standard specifications and design criteria be properly incorporated into the criteria documents. Where they are not, the design-builder will build to a different standard than the district expects, and the disagreement surfaces at acceptance.

Outcome and takeaway

Water district work rewards construction managers who treat testing, commissioning, and acceptance as scheduled activities with real duration rather than as closeout tasks. They are frequently the longest lead items on the project.

See water and wastewater and design-build management.

Project detail
Project
OMWD Pump Station, Fore-bay Tank, and Water Main Extension No. 144
Location
Olivenhain, San Diego County, California
Sector
Water Infrastructure
Firm role
Preconstruction and construction management services
Licensure
California A General Engineering Contractor #777345
Further detail
Additional project information is available on request. Contact us.

Scope elements

The categories of work this project type involves.

  • Design-build delivery management
  • Pump station civil and structural construction
  • Fore-bay tank construction
  • Water transmission main installation
  • Mechanical and electrical coordination
  • SCADA and controls integration
  • Pressure, leakage, and disinfection testing
  • Shutdown and tie-in coordination
  • Commissioning and district acceptance
Similar project

Working on something like this

Tell us the site, the scope, and the constraint that concerns you most. Initial consultations carry no fee and no obligation.

Call the office
858.550.0044
San Diego office
3645 Ruffin Road, Suite 101
San Diego, CA 92123
Hours
Monday through Friday, 7:30 a.m. to 5:00 p.m. Pacific
Licensure
California A General Engineering Contractor #777345

Send us the project

Tell us the site, the scope, and the deadline. Initial consultations carry no fee and no obligation.

We reply to every inquiry within one business day. Your details are used only to respond to this request and are never sold or shared. See our privacy policy.