Roadway and Paving

Paving is the most visible work we do and the most dependent on everything underneath it. A perfect mat over a soft subgrade fails on schedule.

We build roadway from the subgrade up, including the traffic control that lets it happen without closing the street.

California A License #1083980Self-performed and managedSan Diego and Southern California

The mat is only as good as what is under it

Pavement failures are almost never about the asphalt. They are about subgrade that was not proof rolled, base that was not compacted to specification, trench backfill that settled, or drainage that let water under the section. The visible part is the cheapest part to get right and the last one to blame.

What we build

Traffic control is a scope, not a line item

On any roadway project in service, traffic control organizes everything else. Phase boundaries have to leave the road safe overnight and through weekends, which means temporary paving, barrier, striping, and drainage at every transition. Those temporary conditions carry real cost and real schedule, and projects that treat them as an allowance discover the difference in the field.

ADA compliance

Curb ramps, cross slopes, and detectable warning surfaces are inspected against tolerances that are tighter than most crews expect, and non-conforming work gets removed and replaced rather than accepted. We build ramps to the standard the first time because the second time is entirely on us.

Agency standards

City, county, and Caltrans specifications differ on section thickness, materials, compaction, and testing. We build to the standard with jurisdiction, including encroachment permit conditions where we are working within or adjacent to a state facility.

Trench settlement

Most pavement cracking that appears in the first two years traces to utility trench backfill under the section. Since we build the utilities as well on most site packages, we own both sides of that interface, which removes the argument about whose settlement it was.

Roadway capabilities

  • Subgrade preparation and proof rolling
  • Aggregate and treated base
  • Asphalt paving and overlays
  • Cold planing and reclamation
  • Concrete pavement
  • Curb, gutter, and cross gutter
  • Sidewalk and ADA curb ramps
  • Concrete flatwork and hardscape
  • Striping and signage
  • Slurry and surface treatments
  • Staged traffic control
  • Encroachment permit compliance
What you get

How we run this work

Every scope is bid against real quantities and built to the governing agency's standard.

Section verification

Subgrade proof rolled and base compaction tested and documented before any paving, because that is where the section is actually made.

Traffic control plan

A permitted, staged plan with the temporary conditions at each phase boundary priced and drawn, not assumed.

Materials submittals

Mix designs, aggregate sources, and testing approved to the governing agency standard before placement.

ADA compliance record

Ramp slopes and cross slopes measured and documented as built, before the inspector arrives.

Trench interface control

Documented backfill and compaction of utility trench within the paving section.

Smoothness and testing results

The density, thickness, and smoothness testing the specification requires, compiled for acceptance.

Questions we get on this scope

Can you pave in stages to keep the road open?

Yes, and on most public roadway work that is the only option. Staged construction is designed around the permitted traffic control plan, and every stage has to leave a safe, drained, striped condition. We price those interim conditions explicitly.

Do you self-perform the asphalt?

Paving is performed by our own crews or by paving subcontractors under our contract depending on scope and location. Subgrade, base, concrete, and the trench work underneath are our own.

What causes pavement to crack early?

In our experience: trench settlement, inadequate base compaction, and water reaching the subgrade. All three happen below the surface and all three are preventable with testing discipline that costs a fraction of the eventual overlay.

Are you familiar with Caltrans standards?

Yes. We have built and managed work to Caltrans standard specifications and encroachment permit requirements, including roadway work within and adjacent to state facilities.

Request a bid

Get a bid on roadway and paving

Send us the plans, the specification, and the schedule you are working to. We will tell you whether we are the right contractor for it and what it will cost.

Call the office
858.550.0044
San Diego office
3645 Ruffin Road, Suite 101
San Diego, CA 92123
Hours
Monday through Friday, 7:30 a.m. to 5:00 p.m. Pacific
Licensure
California A General Engineering Contractor #1083980
Original license #777345 remains active
Ownership
Women owned and minority owned business

Send us the project

Tell us the site, the scope, and the deadline. Initial consultations carry no fee and no obligation.

We reply to every inquiry within one business day. Your details are used only to respond to this request and are never sold or shared. See our privacy policy.